全黄H全肉短篇禁乱NP慕浅浅,,,

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.chinayhjt.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

通道及施工電梯防護(hù)棚要求要求

來(lái)源:http://m.chinayhjt.com/   發(fā)布時(shí)間:2021-11-18

1塔吊半徑以內(nèi)所有后臺(tái)制作加工、攪拌區(qū)必須搭設(shè)雙層防護(hù)棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場(chǎng)所掛設(shè)的標(biāo)志牌有:機(jī)械驗(yàn)收合格牌、警示牌、操作規(guī)程。標(biāo)牌 的掛設(shè)高度為離地面 2.6 m標(biāo)志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進(jìn)行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開(kāi)關(guān)箱與機(jī)械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護(hù)棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護(hù) 棚名稱和標(biāo)志牌,其余三面采 用警示標(biāo)語(yǔ)。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標(biāo)語(yǔ)字高為400mm,長(zhǎng)度根據(jù)尺寸現(xiàn)場(chǎng)均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標(biāo)志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場(chǎng)地質(zhì)情況做地基處理,處理方法可采用夯實(shí)、換填石 料等,必須保證其密實(shí)度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場(chǎng)場(chǎng)地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場(chǎng)技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標(biāo)注為焊接的地方如無(wú)特殊說(shuō)明的,均作滿焊處理 ,現(xiàn)場(chǎng)安裝前應(yīng)對(duì)各 構(gòu)件焊接質(zhì)量進(jìn)行驗(yàn)收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機(jī)具應(yīng)獨(dú)立配置開(kāi)關(guān)箱,開(kāi)關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺(tái)風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

少妇人妻一区二区三区视频| 国偷自产av一区二区三区123| 玖玖热麻豆国产精品视频| 练车被教练摸出水又吃奶| 偷偷藏不住小说免费阅读| 午夜精品久久久久久久无码| 男人tv天堂精品一区二区 | 国产猛男gayb0y1069| 亚洲欧美乱综合图片区小说区| 欧美大肥婆大肥bbbbb| 欧美做爰又粗又大免费看| 久久久久精品免费a片喷水| 用舌头去添女人下面是不是真爱| 伊人久久综合热线大杳蕉岛国| 无遮挡国产高潮视频免费观看| 第一次啪要猛j还是要温柔点| 啊灬啊灬啊灬快灬深用口述说| 熟妇五十路六十路息与子| 一边吃奶一边做爰| 少妇和大狼拘作爱a片| 少妇被又大又粗又爽毛片欧美| 大肉大捧一进一出| 东北大坑原始欲续全文下载| 99久久国产精品人妻无码| 国产精品自产拍高潮在线观看| 成人h动漫精品一区二区无码| 欧美jizz18性欧美| 久久天天躁狠狠躁夜夜AV麻豆| 野花日本大全免费视频720| 亚洲日韩AV无码中文字幕美国| chinese国产xxx实拍| 久久无码欧美一二三区| 变态捡到女婴h养成调教| 日韩精品一区二区三区| AV视频在线观看| 一女侍七夫巨h双修| 男女激情视频| 被黑人扒开双腿猛进| 疼死了大粗了放不进去| 娇妻在厨房被朋友我的呻吟| 精品国产国偷自产在线观看|